Chinese Wuzhouting 1〜6400W  

‐ Description / Water head=17m, Discharge =45m3/s per unit. Installed 1 set of Kaplan propeller turbine. This Power plant is located 30 km far from our electrical equipments factory. It was set as our example project.

Wuzhouting Hydropower staion

Downstream

Plant

PC Control & monitor system

HV Switchgear

Exciation and LC protection

Measuring & Control Panel

Crane

Down stream

                                 [ BACK ]

 

  Copyright CHENG HSIUNG INTERNATIONAL CORPORATION All Rights Reserved Group Link