Albania Egnatia 2×3000KW
【 Description 】 Egnatia Hydropower project which was located in an area of Librazhd , Albania. It was contracted on March.2008, and would install two sets of pelton water turbine with capacity 2 × 3000KW.
Technical Parameters for this HPP are:
-Water Discharge Calculated: ……….…..Q cal = 2.40 m 3 /sec.
-Upper Water Level: ▼ 539.00m up to 537.86 m above sea Level.
-Turbine Placements: …………..▼ 286.60m above sea Level.
-Net Water Head, H n = 244, 40m .
-Water Quantity Q = 2.00 m 3 /sec to 3.00 m 3 /sec.
-HPP's Power: …………………..Ne HPP = 6 000 kW.
-Yearly Average Production: … E YAv = 25 200 000 kWh / Year.
Our supply scope is design, Hydro mechanical Equipments, Valves Electrical Equipments, Electrical Substation, 1km 110KV HV transmission line, installation, and technical service
This project would finish on March, 2009
Owner visit our factory
Contract signing in our company
[ BACK ]
|