Albania Stranik 1# 2〜2300KW  

‐ Description / Strannik 1# HPP was contract during Aug. 2007.It would install 2 sets of francis turbin generating unit with capactiy 2〜2300kw. The water via a canal of 4kM terminates to a small storage basin from where through a penstock the water will be conveyed to the turbines located on the powerhouse building. At the outlet of the turbines the water will be discharged to the river via tailrace canal. The hydropower will be connected to the Albanian network through an overhead line 35kV.
Main project parameters
Upstream water level
 - Maximum possible water level 690.5masl
 - Normal water level 690masl
 - Minimum water level 688masl
Downstream water level
  - Normal water level 534masl
  -Maximum water level 534.3masl
Penstock 330m /DN1200
Operation condition of the power plant 
 - Gross head 156m
  - Rate net head 153.5m
  - Minimum head 152 m
  - Rated discharge at rated head 2* 1.7m3 /sec
  - Minimum discharge 0.65m3 /sec
Power of units
  -Rated output of the power plant 5200kVA
  -Rated turbine power 「 2*2305kW
  -Rated generator power at cosΦ=0.85 2*2600kVA
  -Turbine type Francis- Horizontal
Climatic data
  -Maximal air temperature 40Cdegr
  -Minimal air temperature -18,4Cdeg

This project would finish on Dec.2008

  
Topographic Map of ^Stranik 1 ̄

 
Technical discussing

 
Technical discussing                Group photo after signing of contract

                                 [ BACK ]

 

  Copyright CHENG HSIUNG INTERNATIONAL CORPORATION All Rights Reserved Group Link