Vietnam Karong hin HPP 2〜2500KW
‐ Description / Vietnam Krong hin HPP was built during May, 2006. It installed 2 sets of Francis turbine generating unit with capacity 2〜2500kw. Water Head is 250m, average water flow is 2.41m3/s.
Over view of the Plant
Penstock
Two sets of Francis turbine generating units
Governor and turbine
Measurement and Protection panels
Outdoor switch station
Outdoor circuit breaker and current transformer
Power transformer 1
Power transformer 2
[ BACK ]
|