Chile Eger 1×800KW

【 Description 】 Chile Eger HPP contracted on Oct. 2006 through Email. The basic data H=9m, Rated discharge=11m3/s Before the installation, both the owner and we contractor did meet each other, all the technical points was solved by email. One sets of Tubular Water turbine generating units with 800KW was installed during Sep and Oct.2008, we dispatched four engineers to the site for service.

Our technical service team and local personnel on Chile site


Horizontal Generator SFW800-20


Tubular water turbine GD007-WZ-160


Governor YWT-3000


Generator Stator


Generator rotor


Plant Equipments


Measuring & protection panels


Butterfly valve in water inlet